Save to pipeline
Connected projectGranted

Protected structure, Ardsallagh House, Ardsallagh Estate, Fethard Co. Tipperary

Granted · Ardsallagh House, Ardsallagh Estate, Fethard Co. Tipperary

Planning records1
Commencement events1
Appeals0
Completion evidence0

Qualified scale is available from the current public evidence. Planning and event-specific quantities remain separate below.

Planning lead

Current planning presentation

(a) demolition of mid 20th century 2-storey extension on north facade & single storey extensions on west facade of the two-storey with attic over basement dwelling (main house), conservatory ruins on south facade and courtyard outbuildings. (b) construction of a new single storey extension & glass link to the west (rear) and a new single storey extension to the north (side) of main house. (c) works to the main house including works to facades on all elevations including removal of existing cementitious render & full lime re-render, refurbishment of the limestone front door surround, cills, minor repairs & refurbishment of entrance railings, refurbishment of existing doors & windows to include slimline double glazing. The building will be altered internally on all levels including modifications to existing partition walls, provision of new lightweight internal stud partitions, partial opening up of existing external walls to rear, 3no. new window opes & repositioning of the stairwell windows on north facade, new staircase between basement and ground floor, lowering of windows & french doors to rear study, 3no. new conservation rooflights & the enlargement of 3no. existing rooflights, alterations to existing doors and windows; general restoration work including the repair of existing ceilings & plasterwork, (d) landscaping works (e) a new waste water treatment system and soil polishing filter and all ancillary and associated site development works. The building is a Protected Structure (Ref. No. S082)

Planning authority
tipperarycountycouncil
Lead planning reference
2560002
Application date
2 Jan 2025
Decision date
25 Feb 2025
Project type
Protected structure

Exact evidence

Planning records

2560002 · Planning application

Tipperary County Council · CONDITIONAL · 2025-02-25

Open official record

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Building control evidence

Separate commencement events

2026-04-24

(a) demolition of mid 20th century 2-storey extension on north facade & single storey extensions on west facade of the two-storey with attic over basement dwelling (main house), conservatory ruins on south facade and courtyard outbuildings. (b) construction of a new single storey extension & glass link to the west (rear) and a new single storey extension to the north (side) of main house. (c) works to the main house including works to facades on all elevations including removal of existing cementitious render & full lime re-render, refurbishment of the limestone front door surround, cills, minor repairs & refurbishment of entrance railings, refurbishment of existing doors & windows to include slimline double glazing. The building will be altered internally on all levels including modifications to existing partition walls, provision of new lightweight internal stud partitions, partial opening up of existing external walls to rear, 3no. new window opes & repositioning of the stairwell windows on north facade, new staircase between basement and ground floor, lowering of windows & french doors to rear study, 3no. new conservation rooflights & the enlargement of 3no. existing rooflights, alterations to existing doors and windows; general restoration work including the repair of existing ceilings & plasterwork, (d) landscaping works (e) a new waste water treatment system and soil polishing filter and all ancillary and associated site development works. The building is a Protected Structure (Ref. No. S082)

1 units · Source-stated event-specific quantity
863 m² · Source-stated event-specific quantity

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Appeal evidence

Appeals

No appeal event is linked.

Completion evidence

Completion records

No completion evidence is linked.