Save this project to account
Connected projectPart 8 Approved By Council

Infrastructure, Site at 12th Lock, Grand Canal Lucan, Co. Dublin

Part 8 Approved By Council · Site at 12th Lock, Grand Canal Lucan, Co. Dublin

Planning records1
Commencement events1
Appeals0
Completion evidence0

Qualified scale is available from the current public evidence. Planning and event-specific quantities remain separate below.

Planning lead

Current planning presentation

The proposed development consists of the demolition and removal of two vacant and derelict industrial sheds to the rear of the protected structure (RPS Ref: 118 Two Storey Industrial Building at 12th Lock, Grand Canal Lucan) and the change of use of a large industrial storage building into a film production studio with associated facilities. The proposed works includes changes to the existing façade and the relocation of the existing ESB substation. The proposal also includes improvements to the public realm along the R120 which consist of the removal of the existing security fencing and the separation of the existing pedestrian pathway and cycling lane. A method statement for the demolition of the two sheds and an Architectural Heritage Impact Assessment are included as part of this application.

Planning authority
southdublincountycouncil
Lead planning reference
SD248/0001
Application date
7 Mar 2024
Decision date
8 Jul 2024
Project type
Infrastructure

Exact evidence

Planning records

SD248/0001 · Planning application

South Dublin County Council · PART 8 APPROVED BY COUNCIL · 2024-07-08

Open official record

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Building control evidence

Separate commencement events

CN0143323SD · 2026-06-15

Material alterations and change of use to the existing Industrial unit to a film production studio with associated facilities.

2350 m² · Source-stated event-specific quantity

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Appeal evidence

Appeals

No appeal event is linked.

Completion evidence

Completion records

No completion evidence is linked.