Save to pipeline
Connected planning records

Planning case 2159

Wicklow County Council · 2159 · Wicklow, Wicklow

Latest linked evidence

Notified commencement · 2022-04-19

Proposed extensions and alterations to an existing 175.6 m2 dwelling. The works will comprise of the following. (1) A proposed single storey extension to the rear C.22 m2. (2) Single storey extension to the side C. 9.6 m2. (3) Dormer extension to accommodate a new stair, bedroom and ensuite at roof level C.30 m2. (3) Alterations to existing internal layout and elevations. (4) Removal of side bay window. (5) New boundary wall and fence detail to side boundary between No. 4 Seapoint and all associated site works

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    2159

  2. Planning decision

    2159

    Conditional permission

  3. Grant date recorded

    2159

  4. Notified commencement

    Commencement notice

    proposed extensions and alterations to an existing 175.6 m2 dwelling. The works will comprise of the following. (1) A proposed single storey extension to the rear C.22 m2. (2) Single storey extension to the side C. 9.6 m2. (3) Dormer extension to accommodate a new stair, bedroom and ensuite at roof level C.30 m2. (3) Alterations to existing internal layout and elevations. (4) Removal of side bay window. (5) New boundary wall and fence detail to side boundary between No. 4 Seapoint and all associated site works

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.