Connected planning records

Planning case 303019

Dublin City Council · 303019 · Ranelagh, Dublin

Latest linked evidence

Notified commencement · 2022-01-24

Single storey above ground rear extension of 31m2 to basement and ground floor incorporated into the main house living accommodation with internal alterations to allow connectivity with proposed new extension with reduction of floor level in basement to provide adequate head height with demolition of a non-original single storey W.C. rear extension with demolition of original single-storey return along southern boundary (10.5m2 in total) with reinstatement of boundary wall along laneway on southern boundary with alterations to existing rear boundary wall with associated site works.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    303019

  2. Planning decision

    303019

    Permission granted

  3. Grant date recorded

    303019

  4. Notified commencement

    Commencement notice

    Single storey above ground rear extension of 31m2 to basement and ground floor incorporated into the main house living accommodation with internal alterations to allow connectivity with proposed new extension with reduction of floor level in basement to provide adequate head height with demolition of a non-original single storey W.C. rear extension with demolition of original single-storey return along southern boundary (10.5m2 in total) with reinstatement of boundary wall along laneway on southern boundary with alterations to existing rear boundary wall with associated site works.

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.