Galway City Council · 2560375

Latest linked evidence

Planning appeal received · 2026-08-26

501977

Open official source

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed build intelligence

What is being built

Government document review

The council decision to grant permission for 48 apartments is under appeal. The 2025 lighting proposal names fittings, while the July 2026 decision requires further lighting and materials approval. These records do not establish final permission, appointed suppliers or installed products.

3 official documents inspected · Checked 2026-09-05 · Official file index

The original lighting report names 25 AXIA fittings

Historical 2025 proposal; later lighting approval unverified · September 2025 lighting design submitted with the original Mincloon application; later approved design not verified

What the evidence says
The September 2025 design lists Urbis Schréder AXIA 3 EVO 1 fittings: type A 6, type B 11 and type C 8, totalling 25. Its layout lists 6 m mounting heights.

The report describes a desktop design. The later council decision requires lighting-design approval; the final fitting list, colour temperature, procurement and installation are not established.

Why it may matter — interpretation
This identifies a specific historic product proposal to compare with any later approved lighting schedule.

What is not established
The report describes a desktop design. The later council decision requires lighting-design approval; the final fitting list, colour temperature, procurement and installation are not established.

Inspect the evidence

Mincloon Outdoor Lighting Report · p.2
Luminaire A, B and C schedules · Issued 2025-09-16 · Project R0; dated 16 September 2025, stamped received 11 December 2025; original proposal, later approved design unverified · Checked 2026-09-05

AXIA 3 EVO 1

Mincloon Outdoor Lighting Report · p.3
Layout continued · Issued 2025-09-16 · Project R0; dated 16 September 2025, stamped received 11 December 2025; original proposal, later approved design unverified · Checked 2026-09-05

6.00

The council requires a further lighting design

July 2026 council requirement; appeal pending · Galway City 2560375 council decision to grant, dated 31 July 2026; under pending appeal 501977

What the evidence says
Condition 17 requires written approval of a lighting design that accounts for existing public-lighting infrastructure and the surrounding area before development begins.

Appeal 501977 is pending. An approved compliance submission and the final lighting products have not been inspected.

Why it may matter — interpretation
This prevents the older product schedule from being treated as the final approved specification.

What is not established
Appeal 501977 is pending. An approved compliance submission and the final lighting products have not been inspected.

Inspect the evidence

25/60375 Notification of decision to grant · p.7
Condition 17 · Issued 2026-07-31 · Chief Executive order PL.26.0646; Condition 1 incorporates revised details received 15 May 2026; appealed, not a final grant · Checked 2026-09-05

submit for written approval a lighting design

The council specifies glazing and finish requirements

July 2026 council requirement; appeal pending · Galway City 2560375 council decision to grant, dated 31 July 2026; under pending appeal 501977

What the evidence says
Conditions 3–6 require obscure first-floor bathroom glazing with top-hung openings, black roofs, agreed stone/brick finishes and concrete boundary walls. Balcony railings must change to agreed glazing or block finishes.

These are appealed council requirements. Specific material products, agreed samples and installed finishes are not established.

Why it may matter — interpretation
The conditions point to concrete glazing and materials evidence to obtain from later compliance documents.

What is not established
These are appealed council requirements. Specific material products, agreed samples and installed finishes are not established.

Inspect the evidence

25/60375 Notification of decision to grant · p.3
Conditions 3–5 · Issued 2026-07-31 · Chief Executive order PL.26.0646; Condition 1 incorporates revised details received 15 May 2026; appealed, not a final grant · Checked 2026-09-05

glazed in obscure glass

25/60375 Notification of decision to grant · p.4
Condition 6 · Issued 2026-07-31 · Chief Executive order PL.26.0646; Condition 1 incorporates revised details received 15 May 2026; appealed, not a final grant · Checked 2026-09-05

glazing or block finish

Independent drainage audits are required

July 2026 council requirement; appeal pending · Galway City 2560375 council decision to grant, dated 31 July 2026; under pending appeal 501977

What the evidence says
Condition 7 requires a Stage 2 storm-water audit before construction and Stage 3 after construction, using an engineer independent of the design team, plus council drainage records when complete.

This is a dated requirement, not evidence that either audit or construction has happened; the appeal remains pending.

Why it may matter — interpretation
The drainage response can be followed into the council condition and later independent audit records.

What is not established
This is a dated requirement, not evidence that either audit or construction has happened; the appeal remains pending.

Inspect the evidence

25/60375 Drainage FI response · p.1
Drainage requirements · Issued 2026-07-21 · Council drainage response dated 21 July 2026; requirements incorporated into Condition 7 of the 31 July decision · Checked 2026-09-05

A Stage 2 audit is required

25/60375 Notification of decision to grant · p.4
Condition 7 · Issued 2026-07-31 · Chief Executive order PL.26.0646; Condition 1 incorporates revised details received 15 May 2026; appealed, not a final grant · Checked 2026-09-05

A Stage 3 audit is required
Remaining document questions
  • Inspect the May 2026 revised design and any subsequent approved lighting and materials submissions.
  • Follow the pending Commission appeal 501977 before treating the council conditions as the final permission.
  • Verify commencement and installed details independently; this review does not establish either.

Three government-hosted PDFs inspected through the exact Galway City 2560375 viewer. Selected pages establish an older lighting proposal and dated council requirements. The May 2026 revised drawing set and the appeal file have not been fully reviewed; later product or design changes remain unverified.

Source history

Timeline

  1. Planning application received

    2560375

  2. Planning decision

    2560375

    Conditional permission

  3. Planning appeal received

    501977

    Official source

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.