Latest linked evidence
Notified commencement · 2020-01-03
The development will consist of alterations to existing two storey four bedroom dwelling to include:(i) partial demolition of single storey kitchen to the front and the demolition of the adjoining shed to the rear; (ii) the construction of a single storey flat roof extension to the rear (north); (iii) the construction of an extension to the side at ground and first floor level (east); (iv) the construction of an extension at first floor level to the front (south west corner); (v) new canopy to the front and side elevation at ground floor level; (vi) new pitched roof to entire house including raising the ridge height (vii) accommodation at attic level with dormer windows to the rear; (viii) alterations to all elevations; (ix) widening of existing entrance gates, (x) roof lights,landscaping; SuDS drainage and all associated works to facilitate the development.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.