Notified commencement · 2021-01-29
The nature of the proposed building is a new single storey ESB MV substation building. The ground floor (28 m2) will contain two MV switch rooms that will contain electrical switchgear equipment. This is an unmanned station building. Each of the two MV switch rooms are controlled remotely, the first room is controlled by the ESB from a centralized location via a System Control and Data Acquisition (SCADA) system via fiber link from a National Control Centre and the second by the adjacent Green Biofuels Ireland facility. This is a controlled environment with access restricted to authorised personnel only; the public will not have access. The station is unmanned during normal operations. Periodic visits will be carried out for inspection and maintenance purposes, for short durations.