Latest linked evidence
Notified commencement · 2026-02-02
The Development consists of: 1) The demolition of the existing structurally unsound two storey return and annexe to the rere elevation (south); 2) The construction of a new, two-storey extension to the rere elevation (south) of the existing building with flat green roof and parapet: The west elevation to the proposed extension is reduced to a single storey where it addresses the shared boundary wall between number 77 & 76 Brighton Square; 3) The provision at ground level of 1no. window to existing and 1no window to proposed east facing gable elevation and the provision at first floor level of 1no. window to proposed extension; 4) The provision of 2no flat rooflights to roof of single storey portion of extension and the provision on 1no flat rooflight to two storey portion of extension; 5) All associated external drainage and site works.
Indexed observation: Granted. Read the linked decisions for their full terms.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.