Latest linked evidence
Notified commencement · 2026-07-14
The development will consist of works to a Protected Structure: 1. On the Entrance Floor level, add an opening in the internal wall between the living and dining room. 2. Demolish existing sunroom and replace with a deck. 4. Renewal of render. 7. On the First Floor, construct a temporary wall to divide the existing bedroom. 8. The replacement of non-original PVC windows with timber framed sash windows. 9. Provision for solar panels on the rear slated roof. 10. Repair and restoration of the existing main slate roof. All along with associated general restoration & decoration works, site works, services and landscaping.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.