Planning case 20448

Tipperary County Council · 20448 · Fethard, Tipperary

Latest linked evidence

Notified commencement · 2021-07-21

Elevational changes to the rear of the building incorporating the construction of a timber deck, renewal of flight of timber stairs to basement, for introduction of steel elements to strengthen and stabilise the structure [as specified by an Engineer], construction of a lobby at first floor level to reconfigure access to one bedroom, restoration of original up and down sash windows, renewal of electrical and plumbing services

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    20448

  2. Planning decision

    20448

    Conditional permission

  3. Grant date recorded

    20448

  4. Notified commencement

    Commencement notice

    elevational changes to the rear of the building incorporating the construction of a timber deck, renewal of flight of timber stairs to basement, for introduction of steel elements to strengthen and stabilise the structure [as specified by an Engineer], construction of a lobby at first floor level to reconfigure access to one bedroom, restoration of original up and down sash windows, renewal of electrical and plumbing services

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.