Latest linked evidence
Notified commencement · 2021-07-21
Elevational changes to the rear of the building incorporating the construction of a timber deck, renewal of flight of timber stairs to basement, for introduction of steel elements to strengthen and stabilise the structure [as specified by an Engineer], construction of a lobby at first floor level to reconfigure access to one bedroom, restoration of original up and down sash windows, renewal of electrical and plumbing services
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.