Connected planning records

Planning case 26130

Galway County Council · 26130

Latest linked evidence

Planning decision · 2026-07-20

26130 · Conditional permission

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed build intelligence

What the documents establish

Government document review

Final permission signed 1 September changes the use of the existing school to full-day childcare. The drawing labels the existing building at 302.5 m²; the reviewed file does not establish new floor area, child capacity or operation of the converted facility.

4 official documents inspected · Checked 2026-09-07 · Official file index

Final permission converts the existing 302.5 m² school

Change of use of the existing school, not additional school floor area

What the evidence says
The final grant signed 1 September permits the former Attymon National School, previously approved under 07/4256, to change to full-time childcare. The 3 June floor plan labels 302.5 m² and retains two classroom spaces, resource rooms and support accommodation. The planner describes minimal work to the existing building.

Why it may matter — interpretation
Childcare fit-out teams can assess reuse of the existing rooms rather than assume a new building or a specified number of child places.

What is not established
Child capacity, an agreed operating programme, construction progress and opening are not established.

Inspect the evidence

Final grant and five conditions · p.1
granted PERMISSION ... change of use ... 07/4256 · Issued 2026-09-01 · C3 signed 1 September 2026; reference 26/130 · Checked 2026-09-07

granted PERMISSION ... change of use ... 07/4256

Childcare floor plan and section · p.1
Area = 302.5 SqM; CLASSROOM 1; CLASSROOM 2 · Issued 2026-06-03 · No drawing number or revision entered; title dated 3 June; received 4 June · Checked 2026-09-07

Area = 302.5 SqM; CLASSROOM 1; CLASSROOM 2

Council planner assessment · p.4
works to the original school building ... minimal · Issued 2026-07-20 · Signed 20 July 2026 on PDF page 6; indexed 21 July · Checked 2026-09-07

works to the original school building ... minimal

Operating hours require written agreement before commencement

Pre-commencement condition in the September final grant

What the evidence says
Condition 3 requires the full-day-care operating hours to be submitted for the council written agreement before development begins. The grant does not itself specify the daily opening and closing times.

Why it may matter — interpretation
Operators and fit-out teams need the agreed service programme when settling access, staffing and building-service arrangements.

What is not established
The submitted hours, written agreement and commencement are not established.

Inspect the evidence

Final grant and five conditions · p.2
3. Prior to commencement ... hours of operation · Issued 2026-09-01 · C3 signed 1 September 2026; reference 26/130 · Checked 2026-09-07

3. Prior to commencement ... hours of operation

The planning assessment relies on the existing wastewater system

Existing service arrangement assessed for the change of use

What the evidence says
The site plan identifies the existing treatment system and percolation area. The planner says the school and childcare facility use the existing septic-tank/percolation connection and that the proposal does not indicate additional loading; the existing water supply also remains.

Why it may matter — interpretation
Civil and services teams should establish condition and capacity of the retained system rather than assume a newly specified treatment plant.

What is not established
A new plant order, independently verified current loading, as-built condition and later compliance are not established.

Inspect the evidence

Submitted existing school and wastewater site layouts · p.2
TREATMENT SYSTEM; EXISTING PERCOLATION AREA · Issued June 2026 (month only) · No drawing number/revision; page 2 dated 3 June; page 1 prints 6 June despite 4 June receipt stamp; chronology not resolved · Checked 2026-09-07

TREATMENT SYSTEM; EXISTING PERCOLATION AREA

Council planner assessment · p.4
Effluent Treatment; proposal does not indicate additional loading · Issued 2026-07-20 · Signed 20 July 2026 on PDF page 6; indexed 21 July · Checked 2026-09-07

Effluent Treatment; proposal does not indicate additional loading

Clean stormwater must stay within the site

Drainage condition in the September final grant

What the evidence says
Condition 4 requires appropriately sized on-site soakaways to BRE Digest 365 or equivalent, limits them to clean uncontaminated stormwater, prohibits discharge onto the road or adjoining property and protects existing drainage.

Why it may matter — interpretation
Drainage designers need the site infiltration and runoff design before confirming any remedial or additional drainage work.

What is not established
Soakaway sizing, infiltration results, installed products and completed drainage works were not reviewed.

Inspect the evidence

Final grant and five conditions · p.2
4. (a)-(c) surface water and soakaways · Issued 2026-09-01 · C3 signed 1 September 2026; reference 26/130 · Checked 2026-09-07

4. (a)-(c) surface water and soakaways
Remaining document questions
  • Have operating hours been agreed, and what evidence establishes childcare capacity and the condition of the reused services?

The declared pages of these government-published PDFs were visually inspected. Other catalogue files, later compliance, procurement and installed specifications were not established. Historical weekly membership is retained separately from these document dates.

Source history

Timeline

  1. Planning application received

    26130

  2. Planning decision

    26130

    Conditional permission

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.