Latest linked evidence
Notified commencement · 2022-05-31
The development will consist of the refurbishment of the existing house, involving conservation works to existing roof and chimneys, new electrical and mechanical services, new bathroom fit-outs at first floor level, new openings and partitions at ground floor level, the conversion of the basement level into two bedrooms with en-suite bathrooms, either side of the existing hall.It will involve the demolition of three existing screen walls, a rear porch and an existing 1st floor WC extension, and the building of two new extensions, one comprising a living room, and the other adining room over a basement store, to either side of the existingfront elevation.The conversion of bedroom 1/6 into two ensuite bathrooms 1/6a and 1/6b and a new laundry room 1/6c. New dropped ceilings in 1/6b and 1/6c and a new services duct from basement to the attic. The conversion of bedroom 1/2 into an ensuite bathroom and forming new double door opening between 1/2 and master bedroom 1/3. Basement store to be used as an office/studio.Relocation of existing treatment system to lower altitude location to facilitate servicing cottages 1 & 2 in yard as well as main house and installation of a new percolation area.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.