Latest linked evidence
Notified commencement · 2014-11-18
Unmanned Petrol Filling Station. 2 no. 4 hose pumps under a canopy dispensing petrol and diesel on each side of the pump; 2 no. 4 hose pumps under a canopy dispensing diesel and marked Gas Oil(MGO) on each side and one addditional two hose pump dispensing Diesel and Adblue; Three underground storage tanks, one 60,000lt tank split 50,000/10,000 lt storing Diesel and Marked Gas Oil, one 40,000Lt tank storing unleaded petrol and one 5,000Lt tank storing Adblue; all the associated fuel pipework between the pumps and underground tanks and fill points and vents;concrete slab surfacing and associated drainage; the drainage from the area around the forecourt and delivery points will be discharged into a 10,000Lt petrol interceptor prior to discharge to the proposed drainage system.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.