Save to pipeline
Connected planning records

Planning case 201233

Wicklow County Council · 201233 · Bré, Wicklow

Latest linked evidence

Notified commencement · 2021-04-29

1. change of use of first floor commercial / retail unit to a medical ophthalmology practice. 2. New signage to existing shop front over front entrance at Castle Street. 3. Remove existing fire escape stairs to rear of building and provide new fire escape stairwell to replace existing with alterations to existing window at first floor level to facilitate same. 4. Alterations to existing ground floor entrance from Castle Street consisting of new entrance doors, reduced floor level for level access, new stairs and lift to first floor. 5. All above with associated site works

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    201233

  2. Planning decision

    201233

    Conditional permission

  3. Grant date recorded

    201233

  4. Notified commencement

    Commencement notice

    1. change of use of first floor commercial / retail unit to a medical ophthalmology practice. 2. New signage to existing shop front over front entrance at Castle Street. 3. Remove existing fire escape stairs to rear of building and provide new fire escape stairwell to replace existing with alterations to existing window at first floor level to facilitate same. 4. Alterations to existing ground floor entrance from Castle Street consisting of new entrance doors, reduced floor level for level access, new stairs and lift to first floor. 5. All above with associated site works

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.