Connected planning records

~166 dwellings, Dublin Pike and, Ballyhooley Road, Ballincrokig - Planning Application 2442789

Cork City Council · 2442789 · Cork

Latest linked evidence

Notified commencement · 2026-06-26

CN0144029CY · Construction of 6no. houses at Coppenger Woods, Dublin Pike, Ballincrokig, Cork. [House Nos 49-54]

Current planning index: Granted. Read the linked decisions for their full terms.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed development story

Coppenger Woods

Follow the decisions, related permissions and individual construction phases, with official sources for each turning point.

Read the development story →

Reviewed build intelligence

What is being built

Government document review

The later 166-dwelling permission includes houses, apartments and a crèche extension. Its official file identifies heating options, fabric targets, EV infrastructure, drainage and lighting requirements. These findings concern the stated documents and house types; they do not establish what was installed in every commenced phase. The numbered drawing maps houses 49–54 to their types; the later public-lighting design lists 79 luminaires across its stated layout. Later finishes identify materials and door products for the five types named in the partial council agreement.

17 official documents inspected · Checked 2026-09-05 · Official file index

Heat pumps and ventilation: options, not one settled schedule

Proposed alternatives · Cork City 24/42789: original 166-dwelling application, before later details were agreed

What the evidence says
The energy statement offers individual systems for houses and apartments: exhaust-air heat pumps, air-source heat pumps with mechanical ventilation and heat recovery, or an electric-heating solution with PV and/or heat pumps and ventilation heat recovery.

Why it may matter — interpretation
Heating and ventilation suppliers can identify the technologies considered and the design questions that still need a phase-specific answer.

What is not established
The selected system, manufacturer, installer and equipment fitted in any particular dwelling are not established.

Inspect the evidence

Climate Action & Energy Statement · p.10
Table 2 — Heat Source and Renewable Energy Solution · Issued 2024-02-19 · Revision 01; job 23031 · Checked 2026-09-05

Source (from either)

Solar PV is considered, not confirmed as installed

Proposed option · Cork City 24/42789: original 166-dwelling application, before later details were agreed

What the evidence says
Solar PV is a candidate renewable technology in the energy strategy and part of one heating option. This file does not establish a fixed panel count or capacity for the commenced houses.

Why it may matter — interpretation
This is relevant to renewable-energy design and supply, provided the later equipment schedule and roof/phase scope are checked.

What is not established
A PV installation, panel quantity, system capacity or available contract is not established.

Inspect the evidence

Climate Action & Energy Statement · p.10
Renewable technology strategy and Table 2 · Issued 2024-02-19 · Revision 01; job 23031 · Checked 2026-09-05

Solar PV

Envelope targets have differing assessment assumptions

Outline targets; differing model assumptions · Cork City 24/42789: original 166-dwelling application, before later details were agreed

What the evidence says
The outline specification sets roof, wall and floor U-values at no more than 0.13, 0.14 and 0.12 W/m²K, with windows at 1.20 W/m²K and air permeability at 2.5 m³/m²h at 50 Pa. The later assessment assumptions use 1.30 W/m²K for windows and 3.0 for air permeability.

Why it may matter — interpretation
The targets give insulation, window and airtightness specialists a useful specification starting point and a clear discrepancy to resolve.

What is not established
Final selected products, installed performance and the applicable approved window/airtightness schedule are not established.

Inspect the evidence

Climate Action & Energy Statement · p.9
Table 1 — proposed outline specification · Issued 2024-02-19 · Revision 01; job 23031 · Checked 2026-09-05

Proposed Outline Specification (Range)

Climate Action & Energy Statement · p.25
Building performance — assessment assumptions · Issued 2024-02-19 · Revision 01; job 23031 · Checked 2026-09-05

construction details assumed

The air-to-water example belongs to an earlier house assessment

Reference assessment; not current-phase installation evidence · Reference assessment: Coppenger Fields Phase 5, house type A1, permission 19/38655; not a certificate for the current scheme

What the evidence says
The energy appendix uses a three-bedroom semi-detached reference dwelling from Coppenger Fields Phase 5, house type A1, under permission 19/38655. Its test-data pages describe an air-to-water heat pump; this is an example used to inform the later proposal.

The appendix report was created 26 October 2023; the enclosing energy statement is dated 19 February 2024.

Why it may matter — interpretation
The example explains the design approach while keeping an older house and the current permission distinct.

What is not established
It is not a BER or installation certificate for houses 49–54 or for all 166 dwellings in 24/42789.

Inspect the evidence

Climate Action & Energy Statement · p.27
Dwelling Details Report — identity and scope · Issued 2024-02-19 · Revision 01; job 23031 · Checked 2026-09-05

Assessment below based on existing dwellings

Climate Action & Energy Statement · p.38
Heating system test data · Issued 2024-02-19 · Revision 01; job 23031 · Checked 2026-09-05

Heat Pump Type Air to Water

The lifecycle report is an indicative early services description

Draft, indicative proposal · Cork City 24/42789: original 166-dwelling application, before later details were agreed

What the evidence says
The draft lifecycle report describes exhaust-air heat-pump water heating with a backup heater for houses and duplex/apartment buildings. It explicitly defers detailed services specifications and uses indicative information.

Why it may matter — interpretation
This identifies a domestic-hot-water design intention and the need to obtain the later mechanical and electrical specification.

What is not established
It does not establish that this system was selected or installed throughout the scheme.

Inspect the evidence

Building Lifecycle Report · p.11
Section 5.1.1 — Mechanical Plant · Issued 2024-03-05 · Issue 1 — Draft issued · Checked 2026-09-05

Exhaust Air Heat Pumps

Building Lifecycle Report · p.5
Report qualification · Issued 2024-03-05 · Issue 1 — Draft issued · Checked 2026-09-05

indicative

EV charging and future ducting are required by the permission

Permission condition · Cork City 24/42789 / ABP-320996-24: conditions of the 29 January 2025 permission

What the evidence says
Condition 12 requires charging stations or points for at least 10% of proposed parking spaces, with ducting to the remaining spaces for later charging-point fitout. Detailed compliance proposals require council agreement.

Why it may matter — interpretation
The permission establishes an electrical-infrastructure requirement, including a distinction between equipped spaces and future ducting.

What is not established
The final approved charging layout, installed count and availability of work are not established by the order alone.

Inspect the evidence

ABP-320996-24 Board Order · p.9
Condition 12 · Issued 2025-01-29 · Final decision order · Checked 2026-09-05

minimum of 10%

The drainage requirement points to specific appeal revisions

Permission condition with named revisions · Cork City 24/42789 / ABP-320996-24: conditions of the 29 January 2025 permission

What the evidence says
Condition 7 ties Attenuation Basin 4 and its weirs to appeal drawings 23031-GA-44 B, 23031-GA-45 B, 23031-GA-46B and 23031-GA-49 B submitted on 4 October 2024, unless otherwise agreed in writing by the council.

Why it may matter — interpretation
Drainage and civil-engineering readers can identify which design revision the decision requires them to check.

What is not established
Later agreed drainage changes and as-built delivery have not been fully reviewed.

Inspect the evidence

ABP-320996-24 Board Order · p.7
Condition 7 · Issued 2025-01-29 · Final decision order · Checked 2026-09-05

Attenuation Basin Number 4

Finishes agreement covers five named house types

Council agreement limited to named types · House types 1.A, 1.B1, 1.B2, 1.C and 1.E1 only, in the 11 August 2025 council response

What the evidence says
On 11 August 2025, Cork City Council accepted submitted materials and finishes for types 1.A, 1.B1, 1.B2, 1.C and 1.E1. It described compliance with Condition 4 as partial and still required details for the remaining types.

Why it may matter — interpretation
Façade, window and external-finish specialists need the house-type schedule before treating one specification as applicable across the development.

What is not established
The linked July schedule now identifies materials and door products. Agreement for the remaining house types, installed products and phase-specific quantities remain unverified.

Inspect the evidence

Condition 4 — Council partial agreement · p.1
Condition 4 — response · Issued 2025-08-11 · Response to details submitted 8 July 2025 · Checked 2026-09-05

This compliance partially agreed.

The council agreed a later lighting submission in February 2026

Council agreement with submitted details · Condition 13: lighting details submitted 6 January 2026 and agreed 27 February 2026

What the evidence says
The council’s 27 February 2026 letter confirms agreement with Condition 13 lighting details submitted on 6 January 2026. The condition includes pedestrian-route lighting through open spaces and consistency with biodiversity mitigation.

Why it may matter — interpretation
Lighting and landscape readers can distinguish the agreed later submission from the original application drawings.

What is not established
The linked later report now supplies an equipment schedule. Council agreement still does not establish installation or allocation to each commenced phase.

Inspect the evidence

Condition 13 — Council agreement · p.1
Condition 13 — response · Issued 2026-02-27 · Response to details submitted 6 January 2026 · Checked 2026-09-05

in agreement with those details

Houses 49–54 can be mapped to their drawing types

Council-agreed numbering; exact drawing labels reviewed · Condition 10 numbered compliance drawing, Revision F, March 2025, in the 24/42789 file; council agreement 4 April 2025

What the evidence says
The numbered compliance drawing labels the six plots as 49: 1.B2m; 50: 1.B1; 51: 1.Am; 52: 1.A; 53: 1.B1m; 54: 1.B2. The council agreed the submitted numbering details on 4 April 2025.

Why it may matter — interpretation
These are the plot numbers in CN0144029CY. Their type labels identify the drawings and later services schedules to check for this six-house commencement.

What is not established
The drawing establishes type labels, not installed equipment. The m suffix is retained exactly; this review does not assume a mirrored type has identical approved finishes or services.

Inspect the evidence

Condition 10 — numbered site and house-type layout · p.1
Plots 049–054; house-type labels · Issued Not stated · Drawing 23031-GA-100, Revision F, March 2025, issued for planning compliance; month only is printed · Checked 2026-09-05

049

Condition 10 — estate numbering submission · p.1
Condition 10 — proposed numbering · Issued 2025-03-28 · Received 1 April 2025; the letter repeats an apparent appeal-reference typo, 320966; identity is supported by the council 24/42789 file, not that typo · Checked 2026-09-05

1 to 166 Coppenger Woods

Condition 10 — Council agreement · p.1
Condition 10 — response · Issued 2025-04-04 · Response to details submitted 1 April 2025 · Checked 2026-09-05

in agreement with those details

The later lighting design contains a 79-luminaire schedule

Later submitted design linked to council agreement · Condition 13: lighting details submitted 6 January 2026 and agreed 27 February 2026

What the evidence says
The revised lighting design lists 79 luminaires across eight schedule types: A 4, B 1, C 3, D 40, E 13, F 12, G 5 and H 1. The schedule names AXIA 3.1 and AXIA 3.2 luminaires with 3000 K LED lamp data.

Why it may matter — interpretation
This supplies a concrete lighting quantity and named product family from the government-published design, linked to the later council agreement.

What is not established
These are design quantities for the stated layout, not a verified installed count or a six-house allocation. Site-survey changes, purchasing, installer appointment and any remaining work package are unverified.

Inspect the evidence

Condition 13 — revised outdoor lighting report · p.2
Luminaire A–D data; No. in Project · Issued 2025-10-20 · OLOS Ballincrokig–Dublin Pike–Cork City R3; received 6 January 2026; only PDF pages 1–3 reviewed · Checked 2026-09-05

No. in Project

Condition 13 — revised outdoor lighting report · p.3
Luminaire E–H data; No. in Project · Issued 2025-10-20 · OLOS Ballincrokig–Dublin Pike–Cork City R3; received 6 January 2026; only PDF pages 1–3 reviewed · Checked 2026-09-05

No. in Project

Condition 13 — revised outdoor lighting layout · p.1
Luminaire data and project quantities · Issued 2025-10-20 · OLOS Ballincrokig–Dublin Pike–Cork City R3; council receipt 6 January 2026 · Checked 2026-09-05

No. in Project

Condition 13 — revised public lighting submission · p.1
Condition 13 — revised public lighting design · Issued 2026-01-05 · Received 6 January 2026; exact council reference 24/42789; copied naming wording and appeal-reference typo 320966 are not used as identity proof · Checked 2026-09-05

revised public lighting design

Condition 13 — revised outdoor lighting report · p.1
Outdoor Lighting Report — design qualification · Issued 2025-10-20 · OLOS Ballincrokig–Dublin Pike–Cork City R3; received 6 January 2026; only PDF pages 1–3 reviewed · Checked 2026-09-05

desktop

Condition 13 — Council agreement · p.1
Condition 13 — response · Issued 2026-02-27 · Response to details submitted 6 January 2026 · Checked 2026-09-05

in agreement with those details

Later finishes identify named materials and door products

Later submitted specification linked to partial council agreement · House types 1.A, 1.B1, 1.B2, 1.C and 1.E1 only, in the 11 August 2025 council response

What the evidence says
The July submission specifies black flat roof tiles and blue/black concrete ridges; a K-Rend sand-and-cement smooth finish painted Polar White; black PVC fascia/soffits, round downpipes and seamless gutters; Roadstone 50 mm Charcoal paving; 170 mm limestone without a plinth; anthracite-grey windows; Ultratech hardwood front doors and AluP aluminium sliding rear doors. The council accepted materials for the five named house types on 11 August 2025.

July replaces the earlier quartz-stone proposal. Agreement is limited to the council-named house types; quantities, purchasing and installed products are unverified.

Why it may matter — interpretation
Roofing, render, stone, paving, glazing and door suppliers can identify actual specified materials and product names from the official file, and distinguish the later submission from the earlier proposal.

What is not established
No material quantities, procurement availability or installed-product verification are established. The drawings illustrate particular type arrangements; this does not certify the exact finishes installed at houses 49–54 or establish agreement for other house types.

Inspect the evidence

Condition 4 — revised finish schedule, boundary and character-area plans · p.1
Condition 4 revised materials schedule · Issued 2025-07-04 · Cover dated 4 July and stamped 8 July 2025; attached boundary plan dated 29 September 2023 and character/phasing diagram dated 30 May 2025 are separate design dates · Checked 2026-09-05

170mm Limestone

House type 1.A finishes drawing · p.1
Finish notes and illustrated material schedule · Issued 2025-07-03 · Drawing 25013-C-104, dated 3 July 2025, council stamp 4 July 2025; no revision letter printed · Checked 2026-09-05

Anthracite Grey Windows

House type 1.B1 finishes drawing · p.1
Finish notes and illustrated material schedule · Issued 2025-07-03 · Drawing 25013-C-204, dated 3 July 2025, council stamp 4 July 2025; no revision letter printed · Checked 2026-09-05

Anthracite Grey Windows

House types 1.B1 and 1.B2 finishes drawing · p.1
Finish notes and illustrated material schedule · Issued 2025-07-03 · Drawing 25013-C-214, dated 3 July 2025, council stamp 4 July 2025; no revision letter printed · Checked 2026-09-05

Anthracite Grey Windows

House types 1.C and 1.E1 finishes drawing · p.1
Finish notes and illustrated material schedule · Issued 2025-07-03 · Drawing 25013-C-304, dated 3 July 2025, council stamp 4 July 2025; no revision letter printed · Checked 2026-09-05

Anthracite Grey Windows

Condition 4 — earlier finish proposals and drawings · p.1
Earlier Condition 4 cover letter · Issued 2025-04-22 · Cover and two drawings received 22 April 2025; earlier stone proposal differs from July details · Checked 2026-09-05

Donegal Quartz Natural stone

Condition 4 — Council partial agreement · p.1
Condition 4 — response · Issued 2025-08-11 · Response to details submitted 8 July 2025 · Checked 2026-09-05

This compliance partially agreed.
Remaining document questions
  • Which later approved mechanical and electrical specification applies to houses 49–54 in CN0144029CY? The notice alone does not answer this.
  • Does a later official submission resolve the heating alternatives and the different window/airtightness assumptions in the energy statement?
  • The council requested finishes for the remaining house types in August 2025. A subsequent agreement for those types has not been verified.
  • Procurement, installer appointments and whether any supply or installation package remains available are not established by these documents.

Seventeen government-published documents inspected, with exact reviewed pages cited. Later July finishes and the August partial council agreement are connected, including the changed stone specification. The numbered plan maps houses 49–54 to type labels; later lighting pages 1–3 supply the 79-luminaire design schedule. Remaining lighting calculations, final services selections, complete phase history and as-built evidence remain unreviewed.

Source history

Timeline

  1. Planning application received

    2442789

  2. Planning decision

    2442789

    Permission refused

  3. Commission case received

    320996

    Official source

  4. Commission case decision

    320996

    Grant Permissions with Conditions

    Official source

  5. Grant date recorded

    2442789

  6. Notified commencement

    CN0127790CY

    Construction of 28no. houses at Dublin Pike, Ballincrokig, Cork. [House Nos 19-46]

    28 units stated for this notice or phase; not a project total.

    · Notice evidence

  7. Notified commencement

    CN0136929CY

    Construction of 24no. houses and 2no. apartment blocks with each apartment block consisting of 4no. apartments at Dublin Pike, Ballincrokig, Cork. [House Nos 1-4, 9-14, 47-48, 93-104] & [Apt Nos 5-8, 15-18]

    Quantity not established for this notice.

    · Notice evidence

  8. Notified commencement

    CN0144029CY

    Construction of 6no. houses at Coppenger Woods, Dublin Pike, Ballincrokig, Cork. [House Nos 49-54]

    6 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.