Latest linked evidence
Notified commencement · 2018-09-17
The development Involves: - The refurbishment of the existing interior of the property - The reconstruction of the existing roof to provide for 3 bedrooms and two bathrooms on the dormer first floor level. - A small single storey rear extension of 5m2. - The proposed roof will be designed in keeping with the adjoining properties to avoid any overlooking or shadowing houses or gardens. - To the front, existing box dormer will be replaced with two traditionally designed windows to fit in with the character of the neighbourhood and adjoining houses. - The dimensions of the two existing ground flood windows to the front of the property will be revised and replaced with new bay windows.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.