Latest linked evidence
Notified commencement · 2026-06-30
• New external door opening centrally to the east elevation of the existing curved link corridor including a new high quality bespoke metal door with glazed sections, a level access threshold and automation as required. • 2no. new internal bespoke demountable ramps with a metal handrail detail and stone tile ramp finish. • New accessible shower room / WC to an existing (15m²) office with new lobby area, including storage, and new level access shower enclosure and WC with timber stud walls, doors on hold open devices and privacy film to existing window. New light fittings. • Door access and automation system controls to 4no. doors. • New permeable granite landscaped path (approximate length 162m, 1.8m width) to existing gravel area, path and raised flower bed area with new edge detail to be formed in either granite kerbs/ metal edging and timber railways sleepers as indicated including associated landscaping works.
Indexed observation: Granted. Read the linked decisions for their full terms.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.