Latest linked evidence
Notified commencement · 2015-05-05
The development will consist of the following principal elements: Removal of fuel store (3.1 SQM) and single-storey annexe (9.6 SQM) both at rear; the construction of part single (32.1 SQM), part two-storey (5.9 SQM) extension to the rear (38 SQM total); Rear elevation changes and internal modifications on the ground, first floor return and first floor of the existing dwelling. These will include the removal of non-original windows and ope enlargement at ground floor level and modification of a single original window to the rear half-landing; Reinstatement of the current bathroom at first floor rear to a bedroom; Provision of a new rooflight over the stairwell located on a rear roof pitch not visible from the street. The overall development will include all associated site development and landscaping works and all conservation and repair work.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.