Save this project to account
Connected planning records

Planning case 201599

Kildare County Council · 201599 · Ballymore Eustace, Kildare

Latest linked evidence

Notified commencement · 2021-04-07

The development works include the material change of use and refurbishment of an existing courtyard accommodation block into 2no. new film and recording studios, and associated accomodation, of 364sqm in area. The proposed change of use and refurbishment works are to include: new performers' green room; 2no. new recording studios and associated control room; the addition of some decorative cladding panels; enlargement of an existing external door opening and installation of a new sliding door; and all related ancillary services and site works on a site area of 403sqm. The refurbishment is located on an estate of approximately 210 hectares. The proposed development is located in the curtilage of Barretstown House, RPS B24-27, and the attached Barretstown Castle, National Monument KD024-029, but the existing courtyard building itself is not a protected structure.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    201599

  2. Planning decision

    201599

    Conditional permission

  3. Grant date recorded

    201599

  4. Notified commencement

    Commencement notice

    The development works include the material change of use and refurbishment of an existing courtyard accommodation block into 2no. new film and recording studios, and associated accomodation, of 364sqm in area. The proposed change of use and refurbishment works are to include: new performers' green room; 2no. new recording studios and associated control room; the addition of some decorative cladding panels; enlargement of an existing external door opening and installation of a new sliding door; and all related ancillary services and site works on a site area of 403sqm. The refurbishment is located on an estate of approximately 210 hectares. The proposed development is located in the curtilage of Barretstown House, RPS B24-27, and the attached Barretstown Castle, National Monument KD024-029, but the existing courtyard building itself is not a protected structure.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.