Latest linked evidence
Notified commencement · 2026-01-27
Removal of the existing boiler shed, the removal of the main dwelling roof structure, including the dormer, all to the rear, the removal of 2no. chimney structures to the side, the conversion of the existing garage to the front, the construction of a single-storey flat roof extension to the rear complete with 2no. flat rooflights, the construction of a new side gable & window at first floor level, raising the rear roof ridgeline and constructing a new dormer extension to the rear at first floor level, the addition of a new porthole window in the gable to the front at first floor level, the installation of 4no. new rooflights to the front and side roof slopes, the installation of photovoltaic solar panels, elevational alterations as well as widening the existing vehicular entrance to the existing two-storey semi-detached dwelling.
Indexed observation: Granted. Read the linked decisions for their full terms.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.