Latest linked evidence
Notified commencement · 2025-03-10
Development at a site to the south-east of the Tesco Superstore, Tullow, Co. Carlow, which extends generally from Mill Street to the Tullow Wastewater Treatment Plant (WwTP), Tullow, Co. Carlow. The development will consist of (1) the decommissioning of: an existing siphon crossing underneath the River Slaney; Abbeywells Pumping Station (Abbeywells PS); a CSO overflow to the River Slaney near to Abbeywells PS; a CSO overflow to River Slaney near Millstreet junction from existing overflow chamber; an existing pumping main from Abbeywells PS to discharge manhole on N81; and an existing septic tank (2) the partial decommissioning of: an existing combined sewer network on the eastern and western sides of the River Slaney (3) the construction of: a new combined sewer network to connect eastern and western agglomerations to the proposed pumping station; a new gravity sewer crossing under the River Slaney to transfer flows from eastern agglomeration; a new Formula A network pumping station to pass flows to Tullow Wastewater Treatment Plant (Tullow WwTP); a new pumping main to transfer flows from the proposed pumping station to Tullow WwTP; a new storm storage chamber to contribute to a total of 450m3 of storage in the proposed pumping station site; a new overflow sewer from proposed pumping station to River Slaney; a new pumping station site to locate wet well, stormchamber, ESB substation, emergency generator and other ancillary equipment; new storm pumps to facilitate storm overfl
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.