South Dublin County Council · SD18A0323 · Dublin 22, Dublin
Latest linked evidence
Notified commencement · 2022-09-21
CN0093712SD · Proposed ESB Substation on the site of a Data Centre (Interxion IX DUB4) at Grangecastle Business Park, Clondalkin, Co. Dublin. The ESB Sub station is a single storey typical ESB Substation divided into two areas, An ESB room and a customer switch room. The proposed ESB substation will be adjacent to, and connected to the existing ESB Substation.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.
Construction of a two storey data centre with three storey central service spine (7,246sq.m) with plant at roof level, that includes a reception area (274.4sq.m), shipping area (264.3sq.m) and three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at ground floor; storage (476sq.m) at mezzanine level above the shipping area; and office (560sq.m), three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at first floor level; and service spine at second floor level only. The new data centre will include plant at roof level; associated support services, 7 standby generators with associated flues (each 17.29m high). These generator units provide back up power to the data halls. An external steel gantry and access stairs is provided to the external generators for inspection and maintenance of the upper level. The proposed facility is to be located within the Grange Castle Business Park and access to the site will be from the existing roads within the business park. Refer to site plan for further details. The proposed building (to be called IX Dub04) is very similar to that previously approved for the IX DUB03 data centre building, also applied for by the same applicant, Interxion Ireland and the new data centre shall be on the same site as IX DUB03, and under the same ownership.
Construction of a two storey data centre with three storey central service spine (7,246sq.m) with plant at roof level, that includes a reception area (274.4sq.m), shipping area (264.3sq.m) and three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at ground floor; storage (476sq.m) at mezzanine level above the shipping area; and office (560sq.m), three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at first floor level; and service spine at second floor level only. The new data centre will include plant at roof level; associated support services, 7 standby generators with associated flues (each 17.29m high). These generator units provide back up power to the data halls. An external steel gantry and access stairs is provided to the external generators for inspection and maintenance of the upper level. The proposed facility is to be located within the Grange Castle Business Park and access to the site will be from the existing roads within the business park. Refer to site plan for further details. The proposed building (to be called IX Dub04) is very similar to that previously approved for the IX DUB03 data centre building, also applied for by the same applicant, Interxion Ireland and the new data centre shall be on the same site as IX DUB03, and under the same ownership.
Proposed ESB Substation on the site of a Data Centre (Interxion IX DUB4) at Grangecastle Business Park, Clondalkin, Co. Dublin. The ESB Sub station is a single storey typical ESB Substation divided into two areas, An ESB room and a customer switch room. The proposed ESB substation will be adjacent to, and connected to the existing ESB Substation.
Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.
Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.