Latest linked evidence
Notified commencement · 2024-03-13
The development will consist of the refurbishment and change of use of a protected structure and the construction of a part 3-storey with roof terrace and a part 4-storey extension with flat roof. The protected structure is a 3 storey over basement building that will change use from part dwelling, part office use to office use only. The construction of the new building will be to the North and East of No. 10 Ardee Street to provide office accommodation and lift/stairs. There is a provision of a 1- storey bicycle and bin store with green roof in the courtyard along with a new pedestrian entrance off St. Luke’s Avenue along with all associated landscape, conservation and site development works including a new boundary wall to eastern boundary. The proposed works to No.10 Ardee Street (protected structure) include the demolition of 3- storey extension to North known as “The Annex” and 1-storey toilet structure to rear (East); the removal and strip out of other non-original partitions; the reinstatement of windows to rear at ground floor and doors and windows to basement; the adjustment of internal opes into the extension at No.9 Ardee Street at ground, first and second floors with 2no new door openings at ground and first floor level; localised repointing to façades; structural strengthening where required. extensive.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.