Latest linked evidence
Notified commencement · 2022-09-07
CN0093191SD · (1); Demolition of existing single and two storey Post Primary school buildings (1050sqm) to the East of the main school buildings. (2); Construction of a part two, part three storey Post Primary School extension (3346sqm in total) configured as follows: a); Three storey extension (1817sqm) North of main school building along the Lucan Road forming new Post Primary School pedestrian entrance off the Lucan Road, b); Two storey extension (1340sqm) to East of main school buildings, c); Two storey extension (escape stairs 55sqm) to the South of main school buildings on the West side of the two storey classroom block, d); Single storey extension (133sqm) at first floor North of the existing PE hall. (3); Reconfiguration of the existing vehicular and pedestrian access off Lucan Heights to form the main Post Primary school vehicular entrance and Secondary pedestrian entrance. (4); The reconfiguration of the existing Primary school pedestrian entrance in it’s current location off the Lucan Road and the re-designation of the existing Post Primary school vehicular entrance as the Primary school vehicular entrance. (5); All associated site works and landscaping. All at St Joseph’s College, Post Primary School and Scoil Mhuire Girls National School, Lucan Road, Lucan, Co. Dublin.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.