Latest linked evidence
Notified commencement · 2023-12-13
Works include the upgrading and conversion of the boathouse to living space, the unblocking of the rear arch to the south and the repair of the timber doors to the north with fixed glazing internally, the replacement of the blockwork on the east facing window with timber shutter to match the west facing window, the installation of a new stove, new flooring, natural internal insulation and rooflights, and repairs to the existing building fabric and structure. The creation of a new, one storey 45m2 zinc clad extension to the rear of the boathouse with dark aluminium windows, to accommodate a kitchen, bedroom, and a bathroom. The construction of new 6.5m2 glazed link to the south side of the boathouse, to connect existing and proposed buildings, accessed via the existing arch. New drainage for the proposed kitchen and bathroom, and associated site works and landscaping.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.