Notified commencement · 2025-07-10
To extend dwellinghouse by the construction of a garden room on eastern side gable and an orangery on first floor to rear of dwellinghouse. The project involves the construction of two conservatories made of glass and wood. They are straightforward traditionally-designed structures and constructed structures. They are largely factory pre-fabricated and assembled on site with minimal preparatory base work and interference with the host building. Access to the new extensions is via existing large door and modified window opening.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.