Save this project to account
Connected planning records

Planning case 201583

Kildare County Council · 201583 · Newbridge, Kildare

Latest linked evidence

Notified commencement · 2022-01-31

CN0085334KE · The development will consist of 1.The renovation and reconfiguration of the interior layout at Charlotte House to include office spaces. 2.The replacement of the existing aluminium windows at Charlotte House to traditional timber sash windows and the replacement of the existing main entrance door with appropriately detailed timber paneled door and side lights. 3.The change of use of the existing extension facing Eyre Street from Retail to Office Spaces at Ground floor level, from Apartments to Office Spaces at First floor Level and from Storage Area to Office Spaces at Second floor level, to include the reconfiguration of the internal layouts. 4.The alteration of the elevation of the existing extension facing Eyre Street at Ground floor level to replace the existing shopfronts with 4 No. Windows. 5.The construction of a single storey extension to the rear of Charlotte House to accommodate ancillary accommodation at ground floor level, a lobby area to connect Charlotte House to the existing extension at First Floor level, a 3 Storey Stairwell located to the North East of the site, together with a roof terrace over the single storey extension, to the rear of Charlotte House. Together with all associated site works at Charlotte House, at the junction of Charlotte Street and Eyre Street, Newbridge, Co. Kildare.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    201583

  2. Planning decision

    201583

    Conditional permission

  3. Grant date recorded

    201583

  4. Notified commencement

    CN0085334KE

    The development will consist of 1.The renovation and reconfiguration of the interior layout at Charlotte House to include office spaces. 2.The replacement of the existing aluminium windows at Charlotte House to traditional timber sash windows and the replacement of the existing main entrance door with appropriately detailed timber paneled door and side lights. 3.The change of use of the existing extension facing Eyre Street from Retail to Office Spaces at Ground floor level, from Apartments to Office Spaces at First floor Level and from Storage Area to Office Spaces at Second floor level, to include the reconfiguration of the internal layouts. 4.The alteration of the elevation of the existing extension facing Eyre Street at Ground floor level to replace the existing shopfronts with 4 No. Windows. 5.The construction of a single storey extension to the rear of Charlotte House to accommodate ancillary accommodation at ground floor level, a lobby area to connect Charlotte House to the existing extension at First Floor level, a 3 Storey Stairwell located to the North East of the site, together with a roof terrace over the single storey extension, to the rear of Charlotte House. Together with all associated site works at Charlotte House, at the junction of Charlotte Street and Eyre Street, Newbridge, Co. Kildare.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.