Connected planning records

Planning case D14A0432

Dun Laoghaire Rathdown County Council · D14A0432 · Mount Merrion, Dublin

Latest linked evidence

Notified commencement · 2014-12-04

Permission for development consisting of: demolition of single storey utility room and boiler shed to the side; construction of single storey extension to the rear and side; new roof over existing side extension and over porch entrance to side; conversion of attic space to new bedroom and en-suite with new dormer to the rear; new velux style rooflights to front, rear and both sides of new and existing roof; new fenestration and opes on front, rear and both sides; (R) of existing widened and altered vehicular driveway entrance; ancillary associated works.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D14A0432

  2. Planning decision

    D14A0432

    Permission granted

  3. Grant date recorded

    D14A0432

  4. Notified commencement

    Commencement notice

    Permission for development consisting of: demolition of single storey utility room and boiler shed to the side; construction of single storey extension to the rear and side; new roof over existing side extension and over porch entrance to side; conversion of attic space to new bedroom and en-suite with new dormer to the rear; new velux style rooflights to front, rear and both sides of new and existing roof; new fenestration and opes on front, rear and both sides; (R) of existing widened and altered vehicular driveway entrance; ancillary associated works.

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.