Save this project to account
Connected planning records

Planning case D17A0215

Dun Laoghaire Rathdown County Council · D17A0215 · Bray, Dublin

Latest linked evidence

Notified commencement · 2018-07-27

THE REMOVAL OF A PORTION OF THE REMAINING FRONT BOUNDARY WALL TO THE NORTH UP TO THE EXISTING PIER AT THE MAIN ENTRANCE GATES, RE-DRESSING THE EXISTING LOWERED AND RAKING WALLS AND THE ERECTION OF A PAINTED MILD STEEL RAILINGS TO MATCH THOSE ALREADY ERECTED ON THE FAR SIDE OF THE MAIN ENTRANCE. THE PROPOSAL ALSO INCLUDES FOR LOCALISED REPAIRS TO THE REMAINING WALL IN RANDOM STONE TO MATCH THE EXISTING WALL IN ACCORDANCE WITH GOOD CONSERVATION PRACTICE AT ST. GERARD’S SCHOOL, THORNHILL ROAD, BRAY, CO. DUBLIN, (A PROTECTED STRUCTURE), BY THE BOARD OF GOVERNORS, ST. GERARD’S SCHOOL TRUST.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D17A0215

  2. Planning decision

    D17A0215

    Permission granted

  3. Grant date recorded

    D17A0215

  4. Notified commencement

    Commencement notice

    THE REMOVAL OF A PORTION OF THE REMAINING FRONT BOUNDARY WALL TO THE NORTH UP TO THE EXISTING PIER AT THE MAIN ENTRANCE GATES, RE-DRESSING THE EXISTING LOWERED AND RAKING WALLS AND THE ERECTION OF A PAINTED MILD STEEL RAILINGS TO MATCH THOSE ALREADY ERECTED ON THE FAR SIDE OF THE MAIN ENTRANCE. THE PROPOSAL ALSO INCLUDES FOR LOCALISED REPAIRS TO THE REMAINING WALL IN RANDOM STONE TO MATCH THE EXISTING WALL IN ACCORDANCE WITH GOOD CONSERVATION PRACTICE AT ST. GERARD’S SCHOOL, THORNHILL ROAD, BRAY, CO. DUBLIN, (A PROTECTED STRUCTURE), BY THE BOARD OF GOVERNORS, ST. GERARD’S SCHOOL TRUST.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.