Latest linked evidence
Notified commencement · 2021-09-07
Repair works to slate roofs including replacement of slate finish and flashings to all roof pitches on a like for like basis, traditional repairs to existing rainwater goods, dormer, rooflights etc; - Replacement of modern roof finishes and ridges with new traditionally detailed metal; - Replacement of roof finishes to central, flat roof area with new membrane roofing system with traditionally detailed metal to south end and fascia, new fall restraint system; - Installation of new paved roof build up to existing first floor terrace roof with new frameless glass balustrade, installation of 2no. new cast iron rainwater pipes and hoppers; - light cleaning of granite facade elements to remove algae and built-up dirt deposits; - Removal of cementitious pointing to 6no. chimneys, new lime pointing to chimneys, localised repairs to lime pointing to facades elsewhere; - Traditional repairs to all sliding sash windows replacement of 4no modern windows and 1no modern door with traditionally detailed timber windows/door; - Installation of ballasted solar collectors to central flat roof area, mechanical upgrades including replacement of boilers and upgrade of thermal controls, retaining all pipework in place
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.