Planning case DZ16A0597

Dun Laoghaire Rathdown County Council · DZ16A0597 · Laughanstown, Dublin

Latest linked evidence

Notified commencement · 2019-03-05

Construction of gas infrastructure. The development will consist of the construction of an above ground installation (AGI) facility, for the operation and maintenance of gas pipeline. The facility includes 2 no. structures - a regulator skid (48.75 sqm, maximum height of 3.2 metres) and a boiler/instrumentation kiosk (48.1 sqm, maximum height of 3.9 metres); associated underground pipework; 2 no. 9m high floodlights and 2.4 metre high security fencing. A new access route from the existing Lehaunstown Lane/M50 overbridge (total length c.601 metres), landscaping and all associated site and development works.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    DZ16A0597

  2. Grant date recorded

    DZ16A0597

  3. Planning decision

    DZ16A0597

    Permission granted

  4. Notified commencement

    Commencement notice

    Construction of gas infrastructure. The development will consist of the construction of an above ground installation (AGI) facility, for the operation and maintenance of gas pipeline. The facility includes 2 no. structures - a regulator skid (48.75 sqm, maximum height of 3.2 metres) and a boiler/instrumentation kiosk (48.1 sqm, maximum height of 3.9 metres); associated underground pipework; 2 no. 9m high floodlights and 2.4 metre high security fencing. A new access route from the existing Lehaunstown Lane/M50 overbridge (total length c.601 metres), landscaping and all associated site and development works.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.