Notified commencement · 2019-03-05
Construction of gas infrastructure. The development will consist of the construction of an above ground installation (AGI) facility, for the operation and maintenance of gas pipeline. The facility includes 2 no. structures - a regulator skid (48.75 sqm, maximum height of 3.2 metres) and a boiler/instrumentation kiosk (48.1 sqm, maximum height of 3.9 metres); associated underground pipework; 2 no. 9m high floodlights and 2.4 metre high security fencing. A new access route from the existing Lehaunstown Lane/M50 overbridge (total length c.601 metres), landscaping and all associated site and development works.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.