264 is the revised whole-scheme total, not264 replacement homes
Proposed amendment; outcome pending · Amendment within Bridgegate SHD; only40 replacement houses in this comparison
What the evidence says
The NIS comparison tables show48 duplexes replaced by40 houses:6 Type1,24 Type2 and10 Type3. The overall scheme changes from272 to264 units.
Amendment within Bridgegate SHD; only40 replacement houses in this comparison Internal page9 mix discrepancy retained; page10 explicit tables used
Why it may matter — interpretation
Interpretation for planners and estimators: separate the replacement package from the whole-scheme total to avoid materially overstating new work.
What is not established
The current Commission summary is compressed and page9 bedroom-mix prose conflicts with the tables. Verify final approved drawings and appeal outcome; no new permission or procurement conclusion is inferred.
Inspect the evidence
Bridgegate Natura Impact Statement · p.10
Inspected PDF page 10 · Issued 2026-02-03 · 2602-NIS-F-2026.02.03; stamped received6February2026 · Checked 2026-09-05
Units subject to amendment 40
The amended area uses two controlled drainage catchments
Proposed amendment; outcome pending · Amended Bridgegate area, not the earlier whole-site Stormtech arrangement
What the evidence says
The proposed amended area uses permeable paving and attenuation, with petrol interceptors and maximum discharge rates of1.4L/s north and2.0L/s south. The report directs the reader to drawingA112-CSC-XX-XX-DR-C-0201.
Amended Bridgegate area, not the earlier whole-site Stormtech arrangement Outfall description inconsistency and old-versus-amended storage scope retained
Why it may matter — interpretation
Interpretation for drainage designers and contractors: the amendment changes the relevant catchment interfaces and flow-control requirements.
What is not established
Page12 contains different descriptions of the outfalls and separately states older storage requirements. Confirm the cited drawing and final discharge agreement before selecting tanks or claiming capacities.
Inspect the evidence
Bridgegate Natura Impact Statement · p.12
Inspected PDF page 12 · Issued 2026-02-03 · 2602-NIS-F-2026.02.03; stamped received6February2026 · Checked 2026-09-05
1.4L/s for the north catchment and 2.0L/s