Notified commencement · 2025-05-09

Proposed internal alterations consisting of lowering existing floor level to create level access from public footpath, proposed new ramp and stepped access internally to main banking hall at Bank of Ireland, The Diamond, Donegal (2) Removal of existing external steps at front door, lowering of existing entrance double doors, and installation of proposed new glazed fanlight over, (3) Removal of existing external ATM, increasing existing ope, and replacing with 1 no. new ATM to front elevation, (4) All associated site works

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    2461610

  2. Planning decision

    2461610

    Conditional permission

  3. Grant date recorded

    2461610

  4. Notified commencement

    Commencement notice

    Proposed internal alterations consisting of lowering existing floor level to create level access from public footpath, proposed new ramp and stepped access internally to main banking hall at Bank of Ireland, The Diamond, Donegal (2) Removal of existing external steps at front door, lowering of existing entrance double doors, and installation of proposed new glazed fanlight over, (3) Removal of existing external ATM, increasing existing ope, and replacing with 1 no. new ATM to front elevation, (4) All associated site works

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.