Notified commencement · 2017-05-29

Development of a 9.62m long extension to the 5m high hurling wall on the south eastern boundary, the removal of 9.62m x 15.2m of existing tarmac surfacing (with the loss of 4 car parking spaces), removal of the 15.2m x 9.57m tarmac ball wall surface adjacent the enclosed All-weather facility, re-surfacing of both these removed areas with synthetic all-weather grass, removal of a 10.1m section of internal 5m high all-weather fencing, erection of a 15.2m long section of internal 5m high all-weather fencing with lockable pedestrian gate securing the new 19.19m x 15.2m area of all-weather, associated ball-stop structure & netting to enclose the facility (to match existing), and all associated site works.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    SD15A0089

    Official source

  2. Planning decision

    SD15A0089

    Permission granted

    Official source

  3. Grant date recorded

    SD15A0089

    Official source

  4. Notified commencement

    Commencement notice

    Development of a 9.62m long extension to the 5m high hurling wall on the south eastern boundary, the removal of 9.62m x 15.2m of existing tarmac surfacing (with the loss of 4 car parking spaces), removal of the 15.2m x 9.57m tarmac ball wall surface adjacent the enclosed All-weather facility, re-surfacing of both these removed areas with synthetic all-weather grass, removal of a 10.1m section of internal 5m high all-weather fencing, erection of a 15.2m long section of internal 5m high all-weather fencing with lockable pedestrian gate securing the new 19.19m x 15.2m area of all-weather, associated ball-stop structure & netting to enclose the facility (to match existing), and all associated site works.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.