Latest linked evidence
Notified commencement · 2026-01-05
The development consist of: (i) Construction of a pitched roof single storey extension to the front; (ii) Relocation of the entrance door to the front elevation and provision of new windows to the side elevation; (iii) Construction of a pitched roof first floor extension to the rear elevation; (iv) Replacement of the existing flat roof to the ground floor rear extension with a pitched roof; (v) Provision of rooflights to the ground floor rear extension and the main house; (vi) Widening of the existing vehicular entrance to 3.5 metres; (vii) Landscaping and SuDS drainage; and (viii) All associated site development works necessary to facilitate the development.
Indexed observation: Granted. Read the linked decisions for their full terms.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.