Latest linked evidence
Notified commencement · 2024-07-18
The works shall consist of the change of use, material alteration and extension to the existing RCSI office building. The works will result in the building becoming a Dental Education Centre with material changes throughout the ground, first and second floors of the building. At ground floor level, the existing office and ancillary rooms will be replaced with a clinical Dental Education Centre area, plant rooms, and other ancillary rooms such as Xray, and Decontamination room. There will be an external plant room at the south of the building, and the existing reception area will be expanded. There will also be changes to the layout of sanitary facilities. At first floor level, there will be 3No. dental simulation rooms, a plasterlab and breakout space. At second floor level, there will be offices, a training room with folding partition, a breakout space and meeting rooms.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.