Connected planning records

Planning case 171211

Kildare County Council · 171211 · Edenderry, Kildare

Latest linked evidence

Notified commencement · 2018-06-18

CN0040216KE · the building of a single-storey conservatory dining room extension to the side of the house, convert a study to a kitchen and convert the kitchen to a toilet suitable for a disabled person and provide disabled access, all on the ground floor. Subdivide and convert one bedroom to an ensuite and dressing room and convert a second bedroom to a bathroom all on the first floor with associated drainage. Rewire the house, provide central heating and a photovoltaic array to save energy, remove two WCs no longer required and redecorate the house, a Protected Structure

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    171211

  2. Planning decision

    171211

    Conditional permission

  3. Grant date recorded

    171211

  4. Notified commencement

    CN0040216KE

    the building of a single-storey conservatory dining room extension to the side of the house, convert a study to a kitchen and convert the kitchen to a toilet suitable for a disabled person and provide disabled access, all on the ground floor. Subdivide and convert one bedroom to an ensuite and dressing room and convert a second bedroom to a bathroom all on the first floor with associated drainage. Rewire the house, provide central heating and a photovoltaic array to save energy, remove two WCs no longer required and redecorate the house, a Protected Structure

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.