Latest linked evidence
Notified commencement · 2023-08-21
Conversion of attic to a study room including the demolition of the existing side chimney, the building up of the side gable wall to form a dutch hip roof, a dormer window to the rear, a rooflight window to the rear, two rooflight windows to the front, removal of the existing side window and two new side windows. All of the above together with all associated site works.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.