Dublin City Council · 337223 · Dublin, Dublin

Latest linked evidence

Notified commencement · 2026-08-10

Phase 1 Fit out the Dunnes Stores Retail Unit, café and and staff areas within Crumlin Shopping Centre, Crumlin, Dublin 12

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    337223

  2. Planning decision

    337223

    Permission granted

  3. Grant date recorded

    337223

  4. Notified commencement

    Commencement notice

    Demolition of the existing Crumlin Shopping Centre and site enabling works in preparation for the construction of a new shopping centre with a separate Commencement Notice proposed to be submitted in summer 2025. Please note that the existing Dunnes retail unit will be open to trade during these works as shown in drawing 1004 Site Plan - Demolition, uploaded with this Commencement Notice

    Quantity not established for this notice.

    · Notice evidence

  5. Notified commencement

    Commencement notice

    Construction of a ESB Substation, MV Switch Room, FM Switch Room and Client Transformer Room as part of the Crumlin Shopping Redevelopment at Crumlin, Dublin 12 as highlighted in green in drawing FC02 Proposed Site Layout uploaded with this Commencement Notice. Please note that the fit-out of the building including the electrical equipment and life safety systems will be completed as part of the shopping centre construction due to begin in summer 2025.

    Quantity not established for this notice.

    · Notice evidence

  6. Notified commencement

    Commencement notice

    Crumlin Shopping Centre Redevelopment – The construction of a new shopping centre and associated works. The construction will be broken into 3 phases. Phase 1 – Construction of the main Dunnes unit finished to shell and core standard to allow the fit-out of the unit to take place (under a separate FSC application and Commencement Notice). Phase 2 – Construction and completion of 6 no. retail units to shell and core standard along with the completion of the mall and public toilets. Phase 3 – Demolition of the existing Dunnes unit and construction of a new food hall to shell and core standard. The phasing plan, including phasing drawings, can be viewed in the Supporting Documents section (under AI1.1-Phasing Plan and AI1.2-Phasing Drawings) with this 7 Day Commencement Notice. The fit-out of the substation building for M&E services will also be completed. Please note that the existing Dunnes unit will remain open to trade until the beginning of Phase 3.

    Quantity not established for this notice.

    · Notice evidence

  7. Notified commencement

    Commencement notice

    Phase 1 Fit out the Dunnes Stores Retail Unit, café and and staff areas within Crumlin Shopping Centre, Crumlin, Dublin 12

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.