Planning case F16B0325

Fingal County Council · F16B0325 · Balbriggan, Dublin

Latest linked evidence

Notified commencement · 2017-11-30

Demolition of existing lean to structure to rear of existing cottage, extension to rear of existing cottage consisting of single storey hipped volume to match existing with new ridge lower than existing ridge height connected to the existing by a link structure with a lower hipped roof. The proposed area of the extension is 71.5m² (against an existing area of 79m²) giving a total area of 150.5m². The proposed finishes are fibre cement slates and nap plaster render. And all associated site works.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    F16B0325

    Official source

  2. Planning decision

    F16B0325

    Permission granted

    Official source

  3. Grant date recorded

    F16B0325

    Official source

  4. Notified commencement

    Commencement notice

    Demolition of existing lean to structure to rear of existing cottage, extension to rear of existing cottage consisting of single storey hipped volume to match existing with new ridge lower than existing ridge height connected to the existing by a link structure with a lower hipped roof. The proposed area of the extension is 71.5m² (against an existing area of 79m²) giving a total area of 150.5m². The proposed finishes are fibre cement slates and nap plaster render. And all associated site works.

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.