Latest linked evidence
Notified commencement · 2015-04-07
Opening up works to front ground floor bedroom Erection of timber stud wall to create an en-suite bathroom at ground floor level Removing one number door and closing in same with timber stud partition Replace with new - sanitary ware to existing bathroom Removing one number wall at ground floor level to allow for open kitchen living space Increase ope size of one number window to rear elevation at ground floor level to proposed living space Replace existing double doors to rear with double glazed - detail to match Installation of solid fuel burning stove to living space Remedial repair works to existing double glazed windows throughout dwelling Replacement of all roof lights with same Remedial repair work to externals of building, including roof and walls Creation of bedroom at first floor level with associated fire rated timber frame wall construction Internal breathable insulation throughout dwelling Re-wire, re-plumb and insulate roof space as required. All associated site works
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.