Latest linked evidence

Planning appeal received · 2026-08-10

501866

Open official source

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed build intelligence

What the documents establish

Government document review

The application is under appeal. The July 2025 energy statement is explicitly a draft; a lighting report issued in March 2026 was received with further information in May 2026. These are source-stage proposals, not installed equipment or a final approval specification.

2 official documents inspected · Checked 2026-09-05 · Official file index

VRF and separate hot-water heat pump proposed

Proposed in application · Service-area building, July 2025 draft energy proposal

What the evidence says
The draft statement proposes VRF heating and cooling for the retail, kitchen and dining areas, electric radiators in ancillary spaces, and a standalone high-temperature air-source heat pump for domestic hot water. Roof space is identified for plant.

Why it may matter — interpretation
Interpretation: separates the principal space-conditioning and hot-water packages and identifies roof-plant coordination.

What is not established
No installed manufacturer, capacity, equipment schedule or procurement is established. An illustrative VRF image is not treated as a project-specific product selection.

Inspect the evidence

Energy Efficiency and Climate Change Adaptation Design Statement · p.11
VRF (Variable Refrigerant Flow) system · Issued 2025-07-02 · G25003-EDC-XX-XX-XX-RP-0001 Rev 03, DRAFT; received 2025-07-22 · Checked 2026-09-05

VRF (Variable Refrigerant Flow) system

20% operational EV provision and wider ducting intent

Proposed in application · Parking provision described by this draft statement

What the evidence says
The energy statement says the intention is for 20% of car-parking spaces to have fully functional EV charging and for ducting to be installed to every car-parking space for future provision.

Why it may matter — interpretation
Interpretation: identifies immediate charger provision and a separate future ducting requirement.

What is not established
This percentage is not converted into a charger count. Final parking totals, electrical demand and approved charger specification are not established from the inspected pages.

Inspect the evidence

Energy Efficiency and Climate Change Adaptation Design Statement · p.12
20% minimum requirement · Issued 2025-07-02 · G25003-EDC-XX-XX-XX-RP-0001 Rev 03, DRAFT; received 2025-07-22 · Checked 2026-09-05

20% minimum requirement

Solar PV remains a conditional option

Proposed in application · Draft energy strategy

What the evidence says
Solar photovoltaic panels are described as being considered where required to supplement renewable-energy provision.

Why it may matter — interpretation
Interpretation: PV is a design option to clarify with a later energy or electrical submission.

What is not established
No committed array, module count, capacity, manufacturer or installation is stated.

Inspect the evidence

Energy Efficiency and Climate Change Adaptation Design Statement · p.13
Photovoltaic (PV) will be considered · Issued 2025-07-02 · G25003-EDC-XX-XX-XX-RP-0001 Rev 03, DRAFT; received 2025-07-22 · Checked 2026-09-05

Photovoltaic (PV) will be considered

Later lighting report identifies three 2700 K luminaire families

Proposed in application · External lighting calculation schedule received as further information on 12 May 2026

What the evidence says
The March 2026 lighting schedule lists 28 type A TWEET NEO S2-X2 luminaires at 104 W, four type B KERIS 2 luminaires at 216 W, and nine type C TWEET ORIGIN S3-X3 luminaires at 132 W; all three schedule entries specify 2700 K.

Why it may matter — interpretation
Interpretation: provides named luminaire families and electrical ratings for checking the later lighting design.

What is not established
Supplier fields are blank. These are modelled schedule quantities, not purchased or installed counts. A repeated identifier appears in the layout listing, so identifiers are not independently summed into a site total. Final approved lighting conditions and later substitutions remain unverified.

Inspect the evidence

Gort Plaza Lighting Layout Report · p.2
TWEET NEO S2-X2 · Issued 2026-03-18 · IG25003; received 12 May 2026 as further information; no revision number established; received 2026-05-12 · Checked 2026-09-05

TWEET NEO S2-X2
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 2 government-published PDFs were visually inspected. Two official PDFs inspected on the listed pages. Registry file links include other application records; no claim that all 201 are technical PDFs or have been inspected. Proposals do not establish procurement or installed work.

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.