Latest linked evidence
Notified commencement · 2026-03-26
The development will consist of: (a) removal of a chimney stack, (b) replacement of roof to the rear room with a hipped roof and finished to match existing, (c) structural works to the existing roof retaining the existing profile, (d) alterations to existing openings on the elevations, (e) proposed front and rear dormer structures, (f) proposed additional rooflights to the side and rear roof pitches, (g) proposed front porch, (h) proposed external insulation to the envelope, (i) widening of existing vehicular entrance.
Indexed observation: Granted. Read the linked decisions for their full terms.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.