Latest linked evidence
Notified commencement · 2025-05-02
CN0128050DC · PROTECTED STRUCTURE: The development will consist of: 1. Internal works at ground floor comprising of: a) Strengthening /repair of original floor structure/timber joists; b) Installation of new electrical services; c) New demountable metal shop security screens to inside of shopfront complete with support framing; 2. Internal works at basement floor comprising of: a) Partial removal/reinstatement of original lath and plaster ceilings, insecticide treatment of timbers; b) Installation of damp proofing drainage sheet/sump to walls and floor with new finishes; c) Repair and part replacement of first (lower) stairs flight; d) Installation of new electrical services; 3. All associated conservation works, repairs, redecoration, drainage and ancillary works.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.