Planning case D25A0928WEB

Dun Laoghaire Rathdown County Council · D25A0928WEB · Dublin 18, Dublin

Latest linked evidence

Notified commencement · 2026-09-04

Construction of a detached two storey house on a sub-divided site to the side of the existing house. The proposed modification will consist of the repositioning of the permitted dwelling by approximately 0.6 metres closer to the public footpath boundary, reduction in height of the permitted boundary wall from 2 metres to 1 metre, revised external finishes comprising light grey brick at ground-floor level and off-white render at first-floor level, minor adjustments to the site layout arising from this repositioning, and all associated site development works.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D25A0928WEB

  2. Planning decision

    D25A0928WEB

    Permission granted

  3. Notified commencement

    Commencement notice

    Construction of a detached two storey house on a sub-divided site to the side of the existing house. The proposed modification will consist of the repositioning of the permitted dwelling by approximately 0.6 metres closer to the public footpath boundary, reduction in height of the permitted boundary wall from 2 metres to 1 metre, revised external finishes comprising light grey brick at ground-floor level and off-white render at first-floor level, minor adjustments to the site layout arising from this repositioning, and all associated site development works.

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.