Connected planning records

Planning case D14A0101

Dun Laoghaire Rathdown County Council · D14A0101 · Mount Merrion, Dublin

Latest linked evidence

Notified commencement · 2014-07-21

Demolition of existing structures and two storey extension (parapet height 6625mm) to rear. Attic conversion with dormer window to rear, extended roof to side and two roof lights to front. Extended porch with new pitched roof (height 3450mm) to cover existing concrete flat roof. Replace garage door with new window. Closing up existing window and enlarging existing window on side elevation. New window fenestration throughout. Enlarging existing site entrance and general site works and drainage associated with the above works at 50 Trees Road Lower, Mount Merrion, Co Dublin

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D14A0101

  2. Planning decision

    D14A0101

    Permission granted

  3. Grant date recorded

    D14A0101

  4. Notified commencement

    Commencement notice

    Demolition of existing structures and two storey extension (parapet height 6625mm) to rear. Attic conversion with dormer window to rear, extended roof to side and two roof lights to front. Extended porch with new pitched roof (height 3450mm) to cover existing concrete flat roof. Replace garage door with new window. Closing up existing window and enlarging existing window on side elevation. New window fenestration throughout. Enlarging existing site entrance and general site works and drainage associated with the above works at 50 Trees Road Lower, Mount Merrion, Co Dublin

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.