Latest linked evidence
Notified commencement · 2020-03-09
The proposed development will consist of the demolition of existing 42m2 single storey side extension and garden wall; construction of a new two-storey 55m2 side [North-West] extension and adjoining new three-storey 137m2 extension to side [North] and rere [East]; installation of new lift; removal of modern glazing to existing side and rere elevations at lower ground and upper ground floor levels; reconfiguration of rooms to create accessible bedroom and bathroom at lower ground floor level; new opening between two existing rooms at lower ground floor level; reconfiguration of upper ground floor bathroom; re-opening existing blocked opening in rere elevation at upper ground floor level; reconfiguration of existing main bathroom and en-suite bathrooms at first floor level; new opening in side elevation at first floor level to provide for proposed window to existing en-suite; new pitched roof structure to replace existing flat roof over previously permitted development at first floor level, incorporating 3no. new rooflights; upgrading of mechanical and electrical services; removal of existing external boiler-house and timber outbuildings to side and construction of new boilerhouse to rere; landscaping works to front and rere; and ancillary site works.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.