Latest linked evidence
Notified commencement · 2026-06-30
The construction of a single-storey porch at ground-floor level to the front of the existing dwelling. B) The construction of a first-floor side extension, together with associated increase to the ground floor footprint to align with the new extension. C) Amendment to the existing hipped roof, including the introduction of a dormer and rooflights, together with the conversion of the existing attic space
Indexed observation: Granted. Read the linked decisions for their full terms.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.