Save to pipeline
Connected planning records

Planning case 248007

Clare County Council · 248007 · Clare

Latest linked evidence

Notified commencement · 2025-07-04

The construction of a residential development consisting of: a) The demolition of two existing dwellings, and part demolition of an existing commerical unit, sheds and outbuidings. B) The construction of 16 no. new residential units in four separate blocks comprising of: 8 no. 1 bed units 3 no. 2 bed units, 5 no. 3 bed units, 2 no. c) ancillary car parking spaces and bin stores within the development. d) Alterations to existing buildings retaining the existing street facade. e) Varied boundary treatments and landscaping works. f) Surface water management will include hydrocarbon interceptor and soakway. g) All ancillary site works

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    248007

  2. Planning decision

    248007

    Decision recorded

  3. Notified commencement

    Commencement notice

    The construction of a residential development consisting of: a) The demolition of two existing dwellings, and part demolition of an existing commerical unit, sheds and outbuidings. B) The construction of 16 no. new residential units in four separate blocks comprising of: 8 no. 1 bed units 3 no. 2 bed units, 5 no. 3 bed units, 2 no. c) ancillary car parking spaces and bin stores within the development. d) Alterations to existing buildings retaining the existing street facade. e) Varied boundary treatments and landscaping works. f) Surface water management will include hydrocarbon interceptor and soakway. g) All ancillary site works

    16 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.