Connected planning records

Planning case 2560768

Louth County Council · 2560768

Latest linked evidence

Planning decision · 2026-07-22

2560768 · Conditional permission

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed build intelligence

What the documents establish

Government document review

W33 appeal324571 concerns Louth2560768. The November2025 EIAR describes1,058 dwellings; ACP reports significant further information received28May2026. The inspected original chapters are historical proposal evidence until compared with that revision.

1 official documents inspected · Checked 2026-09-05 · Official file index

The original EIAR separates houses, duplexes and apartments

Historical proposal; later revisions not inspected · November2025 application scope; later revision not yet reconciled

What the evidence says
The original proposal comprises765 houses,150 duplex units and143 apartments, totalling1,058 dwellings. It also includes a foul pumping station and rising main along Castletown Road.

Why it may matter — interpretation
Interpretation for infrastructure designers: the scale and separate pumping/main works identify what must be checked in the revised servicing package.

What is not established
The May2026 revision may change scope. These are neither current installed counts nor final permission. Inspect revised drawings before applying the total to procurement.

Inspect the evidence

Mount Avenue Dundalk EIAR Chapter3: Description · p.3
Inspected PDF page 3 · Issued November 2025 (month only) · Original November2025 chapter; later significant further information28May2026 unassessed · Checked 2026-09-05

765no. houses, 150no. duplex units and 143no. apartments

The original design specifies a300mm water spine

Historical proposal; later revisions not inspected · November2025 proposed water network across the application site

What the evidence says
The original water design identifies a300mm central spine from the prescribed450mm Mount Avenue connection, a200mm loop and100/150/200mm distribution branches. Houses and duplexes have individual25mm OD PE connections.

Why it may matter — interpretation
Interpretation for water-infrastructure trades: the named pipe sizes support a specific design enquiry, subject to the revised utility agreement.

What is not established
No lengths, installed quantities, current connection approval or supplier award are established. Compare with May2026 further information and Uisce Éireann acceptance.

Inspect the evidence

Mount Avenue Dundalk EIAR Chapter3: Description · p.19
Inspected PDF page 19 · Issued November 2025 (month only) · Original November2025 chapter; later significant further information28May2026 unassessed · Checked 2026-09-05

300mm central spine

Original parking design includes20% EV provision

Historical proposal; later revisions not inspected · Original application parking design, prior to unreviewed further information

What the evidence says
The November2025 description proposes2,020 car spaces, including20% provision for EV charging; it separates1,957 residential spaces from63 local-centre spaces.

Why it may matter — interpretation
Interpretation for electrical designers: there is evidenced EV infrastructure scope to check in the revised electrical and parking schedules.

What is not established
The wording does not establish installed chargers, charger rating, a final active-versus-ducted split or procurement availability. Do not multiply this into an installed charger count.

Inspect the evidence

Mount Avenue Dundalk EIAR Chapter3: Description · p.20
Inspected PDF page 20 · Issued November 2025 (month only) · Original November2025 chapter; later significant further information28May2026 unassessed · Checked 2026-09-05

20% provision for EV Charging
Remaining document questions
  • The May2026 revision may change scope. These are neither current installed counts nor final permission. Inspect revised drawings before applying the total to procurement.
  • No lengths, installed quantities, current connection approval or supplier award are established. Compare with May2026 further information and Uisce Éireann acceptance.
  • The wording does not establish installed chargers, charger rating, a final active-versus-ducted split or procurement availability. Do not multiply this into an installed charger count.

Forty-one ACP PDF links discovered. Four targeted chapters downloaded; description pages3,19,20 visually inspected. May2026 significant further information and final council/appeal conditions not reviewed.

Source history

Timeline

  1. Planning application received

    2560768

  2. Planning decision

    2560768

    Conditional permission

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.